BLD-Final | 6/23/2000 | 6/23/2000 | 6/23/2000 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Energy code compliance | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### DALE Not ready. 1/20/00 4:19:58 PM
|
BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 | P | PASS |
Jim Sly
|
|
|
###-#### DALE\REIN
|
BLD-Framing/Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | FAIL |
Jim Sly
|
|
|
vale ###-####
C/N.. truss bracing, point loads. 1/19/00 11:02:27 AM
|
BLD-Framing/Rough-in | 1/3/2000 | 1/4/2000 | 1/4/2000 | A | PART |
Jim Sly
|
|
|
dale ###-####. Shear wall ok.
|
BLD-Framing/Rough-in | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | FAIL |
Jim Sly
|
|
|
dale ###-#### shear nailing insp. Not ready.
|
BLD-Framing/Rough-in | 12/29/1999 | 12/30/1999 | 12/30/1999 | A | FAIL |
Wes Worcester
|
|
|
###-#### sheer nailing Shear nor hold-downs nailed per plan.
|
BLD-Footing | 11/18/1999 | 11/19/1999 | 11/19/1999 | P | PASS |
Jim Sly
|
|
|
DAVE ###-#### POURING AT 3:00 Footing & wall ok.
|