BLD-Final | 12/7/1999 | 12/7/1999 | 12/7/1999 | P | PASS |
Jim Sly
|
|
|
tom--- ###-#### fn occ C/C #17221.
|
FIRE-Final Inspection | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 10:18:20. Contact: ###-####.No fire inspection required. Structural final rescheduled.
|
BLD-Conference | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | PASS |
Jim Sly
|
|
|
TOM ###-#### Met with builder & owner. Discussed plan to replace burnt areas of roof framing @ fireplace flue.
|
FIRE-Conference | 11/10/1999 | 11/10/1999 | 11/10/1999 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 07:44:34. Contact: ###-####. Not a fire inspection.
|