BLD-Final | 3/6/2000 | 3/6/2000 | 3/6/2000 | P | PASS |
Wes Worcester
|
|
|
key over front door John ###-#### C/C issued #19079, insulation verified @ garage warm wall- with diffiuculty. 3/7/00 9:22:33 AM
|
BLD-Final | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### John
|
BLD-Final | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | FAIL |
Wes Worcester
|
|
|
john ###-#### key over front door Mechanical C/N outstanding (2) 3/6/00 10:47:58 AM
|
BLD-Framing/Rough-in | 1/24/2000 | 1/24/2000 | 1/24/2000 | A | PASS |
Russ Owen
|
|
|
Added a post support in crawl space for beam.
|
BLD-Energy code compliance | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PASS |
Russ Owen
|
|
|
john ###-####. Framing failed do not sheetrock.
|
BLD-Framing/Rough-in | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | FAIL |
Russ Owen
|
|
|
Beam at main level has no support to foundation in crawl.
|
BLD-Framing/Rough-in | 1/11/2000 | 1/12/2000 | 1/12/2000 | A | FAIL |
Russ Owen
|
|
|
john ###-#### fr insp. C/N posted.
|
BLD-Framing/Rough-in | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | NR |
Russ Owen
|
|
|
###-####. Need mechanical and energy package done, before calling in a frame insp.
|
BLD-Framing/Rough-in | 12/29/1999 | 12/29/1999 | 12/29/1999 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 09:23:45. Contact: ###-####. 2 hold-downs missing.
|
BLD-Foundation | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | NR |
Russ Owen
|
|
|
Mana ###-#### No foarm boards up yet.
|
BLD-Foundation | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 10:41:08. Contact: ###-####.
|
BLD-Footing | 12/1/1999 | 12/2/1999 | 12/2/1999 | A | PART |
Tom Arcoraci
|
|
|
mana-- ###-#### or jack ###-#### ft Ft. ok.
|