Permanent Occupancy | | 12/18/2000 | 12/18/2000 | | DONE |
|
|
|
|
BLD-Final | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | PASS |
Jim Storey
|
|
|
Dan ###-####
|
BLD-Final | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/31/2000 at 12:01:25. Contact: ###-####.
|
FIRE-Final Inspection | 6/1/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
BLD-Final | 5/26/2000 | 5/26/2000 | 5/30/2000 | P | NR |
|
|
|
Mel ###-#### done 5/30/00 10:58:00 AM done by 301 hardware not complete 5/30/00 10:58:31 AM
|
FIRE-Final Inspection | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | FAIL |
Rick Jackson
|
|
|
panic on A3 room doors; alarm issues; c/n issued
|
FIRE-Final Inspection | 5/15/2000 | 5/18/2000 | 5/18/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/15/2000 at 17:04:55. Contact: ###-####. Wrong inspection- not ready for final. 5/22/00 8:59:33 AM
|
FIRE-Supply Line Hydro | 5/15/2000 | 5/18/2000 | 5/18/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/15/2000 at 17:05:22. Contact: ###-####. Wrong inspection type. 5/22/00 8:59:50 AM
|
BLD-Framing/Rough-in | 4/26/2000 | 4/27/2000 | 4/27/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 16:51:04. Contact: ###-####. ceillings ok all floors / c/n posted for fire stopping isues to be verfied and damper door access labling. 4/27/00 10:09:06 AM
|
BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 16:08:09. Contact: ###-####. 2 nd floor ceilling ok office areas. need spreaders and corridor lights no done. 4/18/00
|
BLD-Framing/Rough-in | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/06/2000 at 15:42:21. Contact: ###-####. 2 nd floor partion framing west side ok. 4/7/00
|
BLD-Framing/Rough-in | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/03/2000 at 08:50:49. Contact: ###-####.shaft ok to third floor. wall framing 1 st and 2nd floors ok north and south entry ceilling ok north core ceilling ok rated assembly. 4/4/00
|
BLD-Framing/Rough-in | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/16/2000 at 12:49:06. Contact: ###-####. C/N posted 3/17/00 2:40:37 PM
|
BLD-Framing/Rough-in | 3/6/2000 | 3/7/2000 | 3/7/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/06/2000 at 13:58:14. Contact: ###-####. 1st floor corridor & wall framing ok for cover. 2nd floor corridor w/o opening protection ok for cover w/cw to verify top leg screw attatchment to rafter & special insp. welding of precast to be reinspection. 3/7/00 1:33:40 PM
|