BLD-Final | 2/15/2000 | 2/16/2000 | 2/16/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/15/2000 at 13:25:55. Contact: ###-####. L/C issued. 2/16/00 11:50:35 AM
|
BLD-Final | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | NH |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/14/2000 at 12:59:25. Contact: ###-####. Locked out. 2/15/00 1:25:06 PM
|
FIRE-Final Inspection | 12/15/1999 | 12/16/1999 | 12/15/1999 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 13:46:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/15/1999 at 13:57:01.
|
BLD-Framing/Rough-in | 12/6/1999 | 12/7/1999 | 12/7/1999 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 12:52:31. Contact: ###-####. Ok to sheetrock.
|
BLD-Framing/Rough-in | 12/2/1999 | 12/3/1999 | 12/3/1999 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 15:34:02. Contact: ###-####. Needs electrical inspection.
|
BLD-Framing/Rough-in | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/23/1999 at 14:18:11. Contact: ###-####. N/R pending reinspect. After all others are performed.
|