Permit Information
Permit NumberBLD99-03451
StatusFinaled
Name REEL THEATRE - EGYPTIAN
Site Address 700 W MAIN ST
Project NameEGYPTIAN THEATER
Customer Number 
ePlanReviewNo
Description
(PHASE II) To install interior replacement fixed seating in the auditorium per approved plans on file. Main exit aisles are to be maintained at 4'-6" clear down main floor auditorium, side aisles and balcony aisles are to maintain 3'-6" clear. Accessible seating locations are in accordance with CABO/ANSI A117.1 as specified by the 1997 UBC. Compliance with the ADA is regulated by the U.S. Dept. of Justice and is the responsibility of the owner. Occupant load signage to be posted for 786 persons. NOTE: This building is partially fire sprinklered in the attic and basement areas. (mys)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/23/20002/23/20002/23/2000PPASS
Details
Phase II - interior work madeok to issue l/c for the seating only 2/23/00 7:11:02 PM
BLD-Final12/10/199912/10/199912/10/1999APART
Details
Ok for temp. occ.- holding perm. until plmg. & mech. permits are taken care of.
FIRE-Final Inspection12/10/199912/10/199912/10/1999APASS
DetailsRick Jackson
Occupancy approved.
BLD-Final12/8/199912/9/199912/9/1999PFAIL
Details
JACK ###-#### Need mech and plmg. Permits/scoped to exterior work permit same address.
FIRE-Final Inspection12/8/199912/9/199912/9/1999PFAIL
DetailsRick Jackson
JACK ###-#### AROUND 2:00 IF POSSIBLE Fire alarms requires annual test.
FIRE-Conference12/6/199912/7/199912/7/1999APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/06/1999 at 11:30:39. Contact: . Alarm requirements and final inspection scheduled for 12/9/99.