BLD-Final | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | PASS |
Tom Arcoraci
|
|
|
Matt ###-#### L/C issued. 5/26/00 12:09:43 PM
|
BLD-Final | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | FAIL |
Russ Owen
|
|
|
matt ###-#### fn occ
|
BLD-Framing/Rough-in | 1/24/2000 | 1/24/2000 | 1/24/2000 | P | PASS |
Russ Owen
|
|
|
###-#### interior shear nailing on sheetrock. 1/25/00 1:47:58 PM
|
BLD-Framing/Rough-in | 1/20/2000 | 1/21/2000 | 1/21/2000 | A | FAIL |
Jim Storey
|
|
|
shear wall matt ###-#### No approved plan on site unable to insp. interior gyp. spec. do not cover w/o insp. C/N. 1/21/00 1:52:58 PM
|
BLD-Energy code compliance | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | PASS |
Tom Arcoraci
|
|
|
matt- ###-#### energy code
|
BLD-Energy code compliance | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PART |
|
|
|
call first Matt ###-#### energy seal not complete ok to start drywall with c/n items left open 1/18/00 4:56:34 PM
|
BLD-Framing/Rough-in | 1/13/2000 | 1/14/2000 | 1/14/2000 | A | FAIL |
Russ Owen
|
|
|
matt ###-#### call first to meet there Shear nailing no good, also need electrical approved. 1/14/00 3:08:14 PM
|
BLD-Framing/Rough-in | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | PASS |
Russ Owen
|
|
|
matt----###-#### re-ins fr----- call 1st before insp Frame & shear nailing. 1/18/00 8:54:03 AM
|
BLD-Foundation | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PASS |
Russ Owen
|
|
|
found wall insp- jack ###-#### or mana ###-####
|
BLD-Footing | 12/10/1999 | 12/10/1999 | 12/10/1999 | P | PASS |
Russ Owen
|
|
|
JACK ###-#### FT INSP-- Footing.
|