BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### please call Monica when you go out so she can let you in ok for lc pending pluming final 4/17/2002 1:51:38 PM
|
BLD-Final | 10/11/2001 | 10/12/2001 | 10/12/2001 | P | NR |
Carl Dependahl
|
|
|
monica ###-####-- fn --call 1st before insp
|
BLD-Energy code compliance | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/19/2001 5:18:52 PM ok to cover
|
BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 | P | PASS |
Carl Dependahl
|
|
|
monica ###-####
|
BLD-Conference | 12/6/2000 | 12/6/2000 | 12/6/2000 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/6/2000 11:04:12 AM ok to insul ext walls; need htg r/i ok'd...existing dwellng. may call for insps at same time.
|
BLD-Conference | 11/21/2000 | 11/21/2000 | 11/21/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/21/2000 9:50:38 AM left c/n w owner...need plans, fireblox, recommend add beam & addl ceiling for insulation at some locations
|
BLD-Framing/Rough-in | 11/14/2000 | 11/15/2000 | 11/15/2000 | P | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 | P | FAIL |
|
|
|
luck ###-#### no answer on the contact # 8/14/2000 8:13:18 AM
|
BLD-Conference | 3/1/2000 | 3/3/2000 | 3/3/2000 | A | PART |
|
|
|
Monica ###-#### call first need design pro to help with the beam and column sizing 3/6/00 10:28:20 AM
|