BLD-Final | 3/6/2000 | 3/6/2000 | 3/6/2000 | P | PASS |
Jim Sly
|
|
|
Tony ###-#### C/C #17335 3/8/00 9:52:36 AM
|
BLD-Energy code compliance | 2/2/2000 | 2/3/2000 | 2/3/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 17:27:47. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/3/2000 | 2/3/2000 | 2/3/2000 | | PASS |
Jim Sly
|
|
|
Approved with energy inspection.
|
BLD-Framing/Rough-in | 1/31/2000 | 2/1/2000 | 2/1/2000 | P | PART |
Jim Sly
|
|
|
Tony ###-####. shear ok 2/3/00 7:30:09 AM
|
BLD-Framing/Rough-in | 1/21/2000 | 1/24/2000 | 1/24/2000 | P | PART |
Jim Sly
|
|
|
tony ###-#### fr insp--shear wall Shear ok. 1/25/00 1:19:20 PM
|
BLD-Foundation | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | FAIL |
Wes Worcester
|
|
|
ready at 2pm ###-####. Rebar not installed correctly- ie not continuous per Alt. braced panel criteria holddowns and rebar for not installed.
|
BLD-Foundation | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | PASS |
Wes Worcester
|
|
|
approved for cover
|
BLD-Footing | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | FAIL |
Jim Sly
|
|
|
clint ###-#### beep 14236 No one on site.
|