BLD-Final | 5/26/2000 | 5/30/2000 | 5/30/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-#### L/C issued. 5/30/00 3:43:10 PM
|
BLD-Final | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | FAIL |
Russ Owen
|
|
|
Matt ###-#### C/N posted 5/12/00 2:54:52 PM
|
BLD-Final | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | FAIL |
Russ Owen
|
|
|
matt-- ###-#### fn occ C/N posted 5/15/00 11:04:32 AM
|
BLD-Framing/Rough-in | 2/17/2000 | 2/17/2000 | 2/17/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/16/2000 | 2/16/2000 | 2/16/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Need add brg. or truss mod; ok to cover except as noted. 2/17/00 2:06:38 PM
|
BLD-Framing/Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### call first C/N. 2/15/00 1:25:26 PM
|
BLD-Framing/Rough-in | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | PART |
Wes Worcester
|
|
|
Shear panel. Matt ###-####. Need engineering on single hold down on alternate braced panel lines.
|
BLD-Framing/Rough-in | 2/4/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
Wes Worcester
|
|
|
sheer panel Matt ###-####
|
BLD-Foundation | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 12/20/1999 | 12/20/1999 | 12/20/1999 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 10:45:30. Contact: ###-####. All ok, except rebar not in at this time.
|