Permanent Occupancy | | 10/5/2000 | 10/5/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | CANC |
Joe Tawney
|
|
|
ben ###-#### fire fn Cancel already entered 9/18/2000 7:59:30 AM
|
BLD-Final | 9/18/2000 | 9/15/2000 | 9/15/2000 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/18/2000 Reinsp OK for permanant occupancy
|
BLD-Final | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | PASS |
Tony Young
|
|
|
BEN ###-#### FN
ok w/ other trades 9/15/2000 4:05:23 PM
|
BLD-Final | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | NR |
Tony Young
|
|
|
Ben###-####
need fire signoff 9/6/2000 3:41:34 PM
|
FIRE-Final Inspection | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Ben Fail C/N issued 9/7/2000 8:30:42 AM
|
BLD-Conference | 2/7/2000 | 2/7/2000 | 2/7/2000 | A | PART |
|
|
|
with tenant and owner on the issues of changing work as to the approved plans, spoke with architect on the reqs passed down to owner sealed resubmitted drawings are required 2/10/00 10:14:20 AM
|