Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-03561
StatusFinaled
Name O'NEILL HOMES LLC
Site Address 6091 E GATEWAY CT
Project Name 
Customer Number336-3430
ePlanReviewNo
Description
To construct a 2306 sq. ft. two story single family dwelling (1313 sq. ft. first floor/993 sq. ft. second floor) with a attached 874 sq. ft. three car garage and a 136 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a solar protected lot. CU-24-94 per Angie Brosious. PC#957 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/18/20004/19/20004/19/2000APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/18/2000 at 16:31:12. Contact: . Letter on file for tempered glass at hot tub, on order will be put in before hot tub is operational, also requires electrical permit. 4/19/00 1:42:27 PM
BLD-Final4/18/20004/18/20004/18/2000PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/18/2000 at 07:25:15. Contact: . Temp. glass at hot tub 4/19/00 9:55:40 AM
BLD-Final4/12/20004/12/20004/12/2000PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/12/2000 at 09:12:56. Contact: . Crawl space item's 4/13/00 8:59:46 AM
BLD-Final4/4/20004/4/20004/4/2000PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/04/2000 at 07:34:28. Contact: .
BLD-Wall cover2/8/20002/9/20002/9/2000APASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 02/08/2000 at 13:45:15. Contact: .
BLD-Framing/Rough-in2/8/20002/8/20002/8/2000PFAIL
DetailsCarl Dependahl
keep c/n, ok to insulate
BLD-Wall cover2/7/20002/7/20002/7/2000PPASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 02/07/2000 at 10:23:40. Contact: .
BLD-Other2/3/20002/4/20002/4/2000APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/03/2000 at 16:31:07. Contact: . Shear. 2/4/00 2:03:18 PM
BLD-Other2/4/20002/4/20002/4/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/04/2000 at 09:23:49. Contact: . This is a frame inspection c/n int shear etc. ok to insulate.
BLD-Other1/31/20001/31/20001/31/2000PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/31/2000 at 08:57:07. Contact: . garage hold down not done check at frame 2/1/00 8:47:03 AM
BLD-Other1/31/20001/31/20001/31/2000PFAIL
DetailsBob Archibald
garage hold down not nailed bolted done check at frame
BLD-Other1/21/20001/21/20001/21/2000PFAIL
Details
Scheduled by a contractor via Hello! on 01/21/2000 at 07:48:21. Contact: . need to add holddown on the brace panel west of the front entry door may have been poured into the stoop, must be in the wall 1/24/00 8:10:55 AM
BLD-Foundation12/16/199912/17/199912/17/1999APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/16/1999 at 11:31:28. Contact: ###-####. Poured appears ok.
BLD-Footing12/14/199912/15/199912/15/1999APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/14/1999 at 17:01:52. Contact: . Foarms up, ok except no rebar at this time.
BLD-Footing12/14/199912/14/199912/14/1999PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/14/1999 at 08:32:57. Contact: . Nothing done yet.