BLD-Final | 4/18/2000 | 4/19/2000 | 4/19/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 16:31:12. Contact: . Letter on file for tempered glass at hot tub, on order will be put in before hot tub is operational, also requires electrical permit. 4/19/00 1:42:27 PM
|
BLD-Final | 4/18/2000 | 4/18/2000 | 4/18/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 07:25:15. Contact: . Temp. glass at hot tub 4/19/00 9:55:40 AM
|
BLD-Final | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 09:12:56. Contact: . Crawl space item's 4/13/00 8:59:46 AM
|
BLD-Final | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/04/2000 at 07:34:28. Contact: .
|
BLD-Wall cover | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 13:45:15. Contact: .
|
BLD-Framing/Rough-in | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | FAIL |
Carl Dependahl
|
|
|
keep c/n, ok to insulate
|
BLD-Wall cover | 2/7/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 02/07/2000 at 10:23:40. Contact: .
|
BLD-Other | 2/3/2000 | 2/4/2000 | 2/4/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 16:31:07. Contact: . Shear. 2/4/00 2:03:18 PM
|
BLD-Other | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 09:23:49. Contact: . This is a frame inspection c/n int shear etc. ok to insulate.
|
BLD-Other | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 08:57:07. Contact: . garage hold down not done check at frame 2/1/00 8:47:03 AM
|
BLD-Other | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | FAIL |
Bob Archibald
|
|
|
garage hold down not nailed bolted done check at frame
|
BLD-Other | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 07:48:21. Contact: . need to add holddown on the brace panel west of the front entry door may have been poured into the stoop, must be in the wall 1/24/00 8:10:55 AM
|
BLD-Foundation | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 11:31:28. Contact: ###-####. Poured appears ok.
|
BLD-Footing | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 17:01:52. Contact: . Foarms up, ok except no rebar at this time.
|
BLD-Footing | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 08:32:57. Contact: . Nothing done yet.
|