BLD-Final | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 15:06:46. Contact: ###-####. c/n removed c/c # 18270 04/13/2000sealed eng recieved
04/13/2000
|
BLD-Final | 4/12/2000 | 4/12/2000 | 4/12/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 06:55:47. Contact: ###-####.c/n issued need sealed drawing from eng per 407/408 c/n also sec 1003.1.8 locks latches and hardware; signage 04/12/2000
|
FIRE-Final Inspection | 4/12/2000 | 4/12/2000 | 4/12/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 06:55:12. Contact: ###-####.
|
FIRE-Final Inspection | 4/10/2000 | 4/11/2000 | 4/11/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 12:11:59. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/9/2000 | 2/10/2000 | 2/10/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/09/2000 at 12:48:50. Contact: ###-####. Need stamped letter by eng for fix at bathroom ok to cover.
|
BLD-Framing/Rough-in | 1/27/2000 | 1/27/2000 | 1/27/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 06:30:18. Contact: ###-####. need plum. and hvac posted c/n 1/27/00 3:05:48 PM
|
BLD-Conference | 1/7/2000 | 1/7/2000 | 1/7/2000 | A | PART |
|
|
|
with 334 and drs about the work in progress prior to permit issuance
|