BLD-Final | 7/5/2000 | 7/6/2000 | 7/6/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 15:22:27. Contact: ###-####. Keep C/N- need seismic @ conf. rm. lid (cloud). 7/7/00 1:32:49 PM
|
FIRE-Final Inspection | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 11:23:41. Contact: ###-####. reinsp ok for permanent occupancy 7/6/00 8:14:58 AM
|
BLD-Final | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### C/N ok for temp. 3/16/00 1:46:23 PM
|
BLD-Final | 3/15/2000 | 3/15/2000 | 3/15/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### Josh No fire sig. 3/16/00 1:36:05 PM
|
FIRE-Final Inspection | 3/13/2000 | 3/15/2000 | 3/15/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 09:50:32. Contact: ###-####. Final fail C/N issued. 3/16/00 1:40:54 PM
|
FIRE-Final Inspection | 3/13/2000 | 3/14/2000 | 3/14/2000 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 09:38:45. Contact: ###-####. Rescheduled to 3/15/00 3/16/00 11:20:07 AM
|
BLD-Framing/Rough-in | 3/9/2000 | 3/10/2000 | 3/10/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### Grid @ East side. 3/14/00 11:18:40 AM
|
BLD-Framing/Rough-in | 3/6/2000 | 3/6/2000 | 3/6/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Grid @ west side. 3/7/00 9:20:35 AM
|
BLD-Framing/Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | PART |
Carl Dependahl
|
|
|
East side of T/I; walls ok; keep c/n. 2/4/00 11:16:42 AM
|
BLD-Framing/Rough-in | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-#### josh C/N; firestops; ok to cover west side walls only. 1/25/00 1:17:14 PM
|