BLD-Final | 12/14/2000 | 12/15/2000 | 12/15/2000 | P | PASS |
Steven Webb
|
|
|
FN OCC- JAN ###-#### c.of o. issued 12/15/2000 1:29:22 PM
|
BLD-Final | 12/13/2000 | 12/14/2000 | 12/14/2000 | A | FAIL |
Steven Webb
|
|
|
FINAL ###-####Need final electrical inspection. 12/14/2000 10:21:57 AM
|
BLD-Energy code compliance | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | PASS |
Wes Worcester
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | PASS |
Wes Worcester
|
|
|
###-#### 1st trip -- Combustilbes contacting b-vent inadequate draft stop- post address numbers-- Went out on second trip a bit later and they passed the inspection per Wes
|
BLD-Framing/Rough-in | 2/4/2000 | 2/4/2000 | 2/4/2000 | A | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 2/4/2000 | 2/4/2000 | 2/4/2000 | A | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 2/2/2000 | 2/2/2000 | 2/2/2000 | A | FAIL |
Russ Owen
|
|
|
garage wing walls hold downs not nailed to correct studs c\n posted.
|
BLD-Framing/Rough-in | 2/1/2000 | 2/1/2000 | 2/1/2000 | P | FAIL |
Jim Storey
|
|
|
mike ###-#### trans to russ 2/3/00 7:44:31 AM
|
BLD-Framing/Rough-in | 1/28/2000 | 1/31/2000 | 1/31/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 17:03:59. Contact: . went over items with framer straps at garage nailed to wrong studs 1/31/00 1:18:50 PM
|
BLD-Framing/Rough-in | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | NR |
Russ Owen
|
|
|
shear wall mike ###-#### per contractor 1/31/00 1:10:00 PM
|
BLD-Foundation | 12/30/1999 | 12/30/1999 | 12/30/1999 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 12/30/1999 at 06:25:44. Contact: ###-####.
|
BLD-Footing | 12/29/1999 | 12/29/1999 | 12/29/1999 | P | PART |
Russ Owen
|
|
|
DIRK ###-#### 3 TO 4 O'CLOCK. No steel, ground appears to be frozen, contractor will pour when thawed.
|