BLD-Final | 5/10/2001 | 5/10/2001 | 5/10/2001 | | PASS |
Bob Archibald
|
|
|
Final - ok/perm. occ.
|
Permanent Occupancy | | 5/9/2001 | 5/9/2001 | | DONE |
|
|
|
|
BLD-Final | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted 3/21/2001 12:12:22 PM
|
BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Tony Young
|
|
|
###-####
ok for temp. or final occ. after all trades are signed off 11/9/2000 1:53:04 PM
|
FIRE-Final Inspection | 11/8/2000 | 11/9/2000 | 11/9/2000 | A | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for permanant occupancy 11/9/2000 1:05:06 PM
|
BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 15:55:19. Contact: ###-####.
|
FIRE-Final Inspection | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | FAIL |
Joe Tawney
|
|
|
###-####. Reinsp Fail C/N not completed. Reinsp fee assessed 11/7/2000 12:06:52 PM
|
BLD-Final | 11/3/2000 | 11/6/2000 | 11/6/2000 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/03/2000 at 13:42:25. Contact: ###-####.
|
FIRE-Final Inspection | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail Fire ext and smoke detector 11/6/2000 12:10:26 PM
|
BLD-Wall cover | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 12:49:52. Contact: ###-####.
ok to rock, need to see nailing on sheetrock for shear 8/31/2000 10:25:18 AM
|
BLD-Framing/Rough-in | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/17/2000 at 16:49:53. Contact: .
ok to insulate, still waiting for energy code compliance paper work. do not pass pass for sheetrock untill E. C. compliance 8/18/2000 9:41:29 AM 8/18/2000 9:44:01 AM
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 11:13:58. Contact: ###-####.
C/N posted , staps , energy code, shear nailing, draftstops and energy seal. 8/14/2000 4:25:32 PM
|
BLD-Wall cover | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:50:41. Contact: ###-####.
|
BLD-Wall cover | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 13:54:47. Contact: ###-####. Not ready- items on C/N not complete 7/18/00 1:24:20 PM
|
BLD-Wall cover | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 11:05:17. Contact: ###-####. C/N posted 7/7/00 1:46:13 PM
|
BLD-Foundation | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PASS |
|
|
|
Added by Inspector: 338 On 5/4/00 made ok to pour r-bar and hold downs in place
|
BLD-Footing | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
|
|
|
ok to pour 5/2/00 4:05:17 PM
|