BLD-Conference | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/1/2001 2:12:01 PM rec'd eng's & spec. insp's affidavits ...ok
|
BLD-Final | 5/10/2001 | 5/10/2001 | 5/10/2001 | | PASS |
Bob Archibald
|
|
|
Final - ok for perm. occ.
|
Permanent Occupancy | | 5/9/2001 | 5/9/2001 | | DONE |
|
|
|
|
BLD-Final | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | FAIL |
Tony Young
|
|
|
Chris Connor ###-####
c/n posted 3/21/2001 12:09:16 PM
|
BLD-Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | PASS |
Steven Webb
|
|
|
FN OCC- ###-####- JANELLE
|
BLD-Final | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 12:38:25. Contact: ###-####.
c/n posted, no inspection made, need trade sign offs 11/13/2000 1:40:22 PM
|
FIRE-Final Inspection | 11/10/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 12:37:36. Contact: ###-####.
|
BLD-Wall cover | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 12:51:12. Contact: ###-####.
ok to sheetrock ,, need to see nailing on sheetrock for shear 8/31/2000 10:26:20 AM
|
BLD-Framing/Rough-in | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/17/2000 at 16:51:42. Contact: .
|
BLD-Framing/Rough-in | 8/18/2000 | 8/18/2000 | 8/18/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 8/18/2000
ok to insulate, need energy code b-4 sheetrock 8/18/2000 4:10:49 PM
|
BLD-Wall cover | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 07:51:39. Contact: ###-####.
|
BLD-Wall cover | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 13:55:35. Contact: ###-####. Not ready 7/18/00 1:23:59 PM
|
BLD-Wall cover | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/06/2000 at 11:06:21. Contact: ###-####. C/N left 7/7/00 1:45:27 PM
|
BLD-Foundation | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PASS |
|
|
|
Added by Inspector: 338 On 5/4/00 r-barandhold downs in place
|
BLD-Footing | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
|
|
|
ok to pour 5/2/00 4:05:26 PM
|