BLD-Framing/Rough-in | 3/16/2000 | 3/16/2000 | 3/16/2000 | P | PASS |
Jim Sly
|
|
|
allen ###-#### shear & energy code pass 3/17/00 10:35:59 AM
|
BLD-Framing/Rough-in | 3/10/2000 | 3/10/2000 | 3/10/2000 | P | FAIL |
Jim Sly
|
|
|
allen ###-#### C/N.. eng. to approve shear, ceiling height low bonus room. 3/14/00 11:17:14 AM
|
BLD-Framing/Rough-in | 3/9/2000 | 3/9/2000 | 3/9/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N.. not authorized to side, need appr. plan. 3/14/00 11:02:22 AM
|
BLD-Foundation | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PASS |
Jim Sly
|
|
|
###-#### DAN \STEM WALL
|
BLD-Footing | 1/12/2000 | 1/12/2000 | 1/12/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/12/2000 at 07:14:28. Contact: ###-####. No approved plans, footings appear ok.
|
BLD-Footing | 1/10/2000 | 1/11/2000 | 1/11/2000 | A | FAIL |
Jim Sly
|
|
|
FT INSP ---ERIC ###-####. Raining.. Not ready.
|
BLD-Footing | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | FAIL |
Jim Sly
|
|
|
###-####-allan. Not ready.
|