BLD-Energy code compliance | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 16:20:06. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Foundation | 2/15/2000 | 2/15/2000 | 2/15/2000 | P | PASS |
Jim Sly
|
|
|
shear panel- re-insp -mike ###-#### Change to wall cover insp. Shear ok. 2/16/00 9:24:25 AM
|
BLD-Framing/Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | FAIL |
Jim Sly
|
|
|
shear panel Mike ###-#### Not ready. 2/15/00 1:22:03 PM
|
BLD-Wall cover | 2/15/2000 | 2/15/2000 | 2/15/2000 | A | PASS |
Jim Sly
|
|
|
Shear ok.
|
BLD-Foundation | 1/13/2000 | 1/14/2000 | 1/14/2000 | A | FAIL |
Jim Sly
|
|
|
WALL\\###-#### DONNY Not ready for wall insp. 1/14/00 3:04:44 PM
|
BLD-Foundation | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PART |
Jim Sly
|
|
|
donny ###-#### footing appears ok. 1/14/00 2:11:22 PM
|