BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Dave Hannah
|
|
|
CHRIS ###-#### FN
|
Permanent Occupancy | | 11/7/2000 | 11/7/2000 | | DONE |
|
|
|
|
BLD-Final | 6/26/2000 | 6/27/2000 | 6/26/2000 | A | FAIL |
Carl Dependahl
|
|
|
chris ###-#### ok for t/o; need stamped letter regen enclosure, egress control & door(s) added 6/29/00 1:18:49 PM
|
BLD-Conference | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | PASS |
Carl Dependahl
|
|
|
W/ISI foreman re: final & proposed changes- keep C/N.
|
BLD-Conference | 4/7/2000 | 4/7/2000 | 4/7/2000 | P | PASS |
Carl Dependahl
|
|
|
reviewed arch's letter re generator enclosure, need stamp for approval
|
BLD-Final | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### C/N, need complete Elec. ok & Gen. enclosure. 3/30/00 10:52:30 AM
|
FIRE-Final Inspection | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp. ok for perm. occ. 3/30/00 10:58:30 AM
|
BLD-Final | 3/28/2000 | 3/28/2000 | 3/28/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Kee C/N! 3/29/00 10:01:54 AM
|
FIRE-Final Inspection | 3/28/2000 | 3/28/2000 | 3/28/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp. fail S/F damper activation & door clearance 3/29/00 10:10:56 AM
|
FIRE-Final Inspection | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### reinspec. fail all items on C/N not completed 3/27/00 4:22:13 PM
|
BLD-Final | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | FAIL |
Carl Dependahl
|
|
|
Lee ###-#### C/N-recall 3/23/00 3:00:59 PM
|
BLD-Final | 3/23/2000 | 3/23/2000 | 3/23/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Keep C/N 3/24/00 9:25:02 AM
|
FIRE-Final Inspection | 3/23/2000 | 3/23/2000 | 3/23/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final fail C/N issued. 3/24/00 9:29:36 AM
|
FIRE-Final Inspection | 3/23/2000 | 3/23/2000 | 3/23/2000 | P | FAIL |
Joe Tawney
|
|
|
lee with MK ###-#### Final fail C/N issued. 3/24/00 9:29:44 AM
|
FIRE-Final Inspection | 3/22/2000 | 3/22/2000 | 3/22/2000 | P | PART |
Joe Tawney
|
|
|
###-#### Ok on alarm system. 3/23/00 9:01:44 AM
|
FIRE-Final Inspection | 3/21/2000 | 3/21/2000 | 3/21/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### jim Alarm test fail C/N issued. 3/22/00 9:20:59 AM
|
BLD-Final | 3/17/2000 | 3/20/2000 | 3/20/2000 | P | FAIL |
Carl Dependahl
|
|
|
this is for a temp occ chris ###-#### Need all other insp. 3/21/00 9:29:12 AM
|
BLD-Framing/Rough-in | 2/25/2000 | 2/28/2000 | 2/28/2000 | A | FAIL |
Carl Dependahl
|
|
|
ceiling grid---kent ###-#### C/N: 1hr ceiling req'd @ corridor lights & assy @ vestibule. 2/28/00 2:45:13 PM
|
BLD-Framing/Rough-in | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Kent keep c/n W.I.P
|
BLD-Conference | 2/3/2000 | 2/3/2000 | 2/4/2000 | A | PASS |
Carl Dependahl
|
|
|
W/framer, keep C/N, need htg. etc.
|
BLD-Framing/Rough-in | 2/2/2000 | 2/2/2000 | 2/2/2000 | P | FAIL |
Carl Dependahl
|
|
|
2nd floor--metal stud fr-- kent --cell ###-#### c\n firestops 1hr wall lid, suspended clg 2/3/00 9:13:40 AM
|