BLD-Conference | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | PART |
Jim Sly
|
|
|
###-#### Forest call first to meet there Talked to owners....Builder scheduled attic blow in for Mon. 20th 8/16/2001 11:04:50 AM
|
BLD-Final | 8/9/2000 | 8/10/2000 | 8/10/2000 | P | PASS |
Jim Sly
|
|
|
dwight-- ###-#### fn
|
BLD-Final | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | CANC |
Jim Sly
|
|
|
dWIGHT cOOMBS ###-#### THE CODE IS 5407//cancel per dwight
|
BLD-Framing/Rough-in | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### Chik top riser. 4/21/00 2:06:33 PM
|
BLD-Framing/Rough-in | 4/7/2000 | 4/10/2000 | 4/10/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N...add int. shear panels, overbored studs. 4/11/00 11:18:13 AM
|
BLD-Framing/Rough-in | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Compl. prev. corr 4/4/00 9:36:12 AM
|
BLD-Framing/Rough-in | 4/3/2000 | 4/3/2000 | 4/3/2000 | A | FAIL |
Jim Sly
|
|
|
C/N.. no plans, no shear insp.
|
BLD-Framing/Rough-in | 3/30/2000 | 3/31/2000 | 3/31/2000 | P | NR |
Carl Dependahl
|
|
|
###-#### recall 4/3/00 8:53:49 AM
|
BLD-Foundation | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | FAIL |
Jim Sly
|
|
|
ready at 11am ###-#### Not ready- need 4 horizontal rebar per plan. 10:45 am. 1/20/00 4:19:50 PM
|
BLD-Footing | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | FAIL |
Alan Hauser
|
|
|
pat ###-#### early pm No plans & no one on site. 1/19/00 11:05:24 AM
|