BLD-Final | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | PASS |
|
|
|
DEAN ###-#### FN--KEYS IN ELEC BOX BY A/C cc # 19369 8/14/2000 10:14:59 AM
|
BLD-Final | 7/24/2000 | 7/24/2000 | 7/24/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 07:17:05. Contact: ###-####. Not ready 7/24/00 1:27:33 PM
|
BLD-Energy code compliance | 6/26/2000 | 6/27/2000 | 6/27/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 06/26/2000 at 12:49:37. Contact: ###-####. ok to cover 6/27/00 4:30:05 PM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | PART |
|
|
|
###-#### out of time ok to insulate only will inspect energy and frame at the same time 6/28/2k 6/26/00 5:07:32 PM
|
BLD-Framing/Rough-in | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | PASS |
Jim Storey
|
|
|
shear wall ###-#### exterior ok. 6/13/00 7:46:02 AM
|
BLD-Framing/Rough-in | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | FAIL |
|
|
|
###-#### NEED STRAPS OUTSIDE OF THESHEATHING 5/17/00 3:48:32 PM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PASS |
Carl Dependahl
|
|
|
|
BLD-Foundation | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PASS |
Russ Owen
|
|
|
###-#### Walls. 3/8/00 10:36:00 AM
|
BLD-Foundation | 3/3/2000 | 3/6/2000 | 3/6/2000 | P | PART |
|
|
|
early pm ###-#### made ok to pour footings only with reciept of eng soil compaction test 3/6/00 5:52:28 PM
|
BLD-Footing | 3/2/2000 | 3/3/2000 | 3/3/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 17:15:50. Contact: ###-####. eng letter needed to be sent to 407 3/6/00 10:30:10 AM
|