Final | 9/27/2000 | 9/28/2000 | 9/28/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 12:56:58. Contact: ###-####. Checked corrections. They were completed ok final 9/29/00 11:06:45 AM
|
Final | 8/8/2000 | 8/8/2000 | 8/8/2000 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 8/8/2000 need info on voltage drop size of equip grd
|
Final | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 08:41:55. Contact: ###-####.canceled by romar 8/8/2000 8:03:35 AM
|
Final | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 13:45:44. Contact: ###-####. called to meet left message 5/1/00 10:22:35 AM
|
Electrical Rough-In | 1/6/2000 | 1/6/2000 | 1/6/2000 | P | PART |
Jack Frank
|
|
|
###-#### tony\\shopko warehouse\\###-#### tony. Restrooms ok.
|