Electrical Rough-In | 2/11/2000 | 2/14/2000 | 2/14/2000 | A | PART |
Jack Frank
|
|
|
richard ###-#### conference only Spa shall be wired and permited by electrical contractor. 2/15/00 9:24:39 AM
|
Electrical Rough-In | 1/7/2000 | 1/7/2000 | 1/7/2000 | P | PART |
Marv Burrus
|
|
|
conf. only ###-####. Conference; service/meter installation.
|