Final | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | PASS |
Joe Ray
|
|
|
Jim ###-####
|
Final | 5/30/2000 | 5/30/2000 | 5/30/2000 | P | FAIL |
Joe Ray
|
|
|
###-#### JIM
|
Electrical Rough-In | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 15:47:28. Contact: ###-####. CEILINGS ONLY FOR COVER 5/12/00 3:20:46 PM
|
Permanent Service | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PART |
Joe Ray
|
|
|
###-#### Main service gear 4/5/00 8:28:02 AM
|
Electrical Rough-In | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | PASS |
Joe Ray
|
|
|
###-#### Ok cover walls 4/3/00 8:44:39 AM
|
Electrical Rough-In | 1/7/2000 | 1/7/2000 | 1/7/2000 | P | PASS |
Jack Frank
|
|
|
undergroung\\###-#### Jim. R/I U/G ok.
|