Final | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | PASS |
Pat Lass
|
|
|
###-####. Final ok.
|
Permanent Service | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 07:48:48. Contact: ###-####.
|
Electrical Rough-In | 1/7/2000 | 1/10/2000 | 1/10/2000 | A | PASS |
Pat Lass
|
|
|
r/i and p/s Glenn Electric ###-####. R/I ok.
|