Final | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 08:10:58. Contact: ###-####.
|
Electrical Rough-In | 5/16/2000 | 5/16/2000 | 5/16/2000 | A | PART |
Jack Frank
|
|
|
Scheduled by Inspector: 315 On 5/16/00 meeting with 336 conference ok 5/16/00 11:30:09 AM
|
Final | 5/15/2000 | 5/15/2000 | 5/16/2000 | P | FAIL |
Pat Lass
|
|
|
pat ###-#### fn Clearances 5/16/00 1:10:38 PM
|
Final | 5/16/2000 | 5/15/2000 | 5/15/2000 | P | FAIL |
Jack Frank
|
|
|
Added by Inspector: 315 On 5/16/00 see jf
|
Electrical Rough-In | 2/16/2000 | 2/19/2000 | 2/19/2000 | P | PASS |
Pat Lass
|
|
|
around 5:00 pat marks ###-#### as per jim schmer. Partial U/G R/I ok 1hr. 3:15 to 4:15 pm.
|
Permanent Service | 1/11/2000 | 1/11/2000 | 1/11/2000 | P | PASS |
Pat Lass
|
|
|
###-#### pat p/s ok 1/28/00 9:55:19 AM
|
Permanent Service | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | FAIL |
Pat Lass
|
|
|
3 PHASE SERVICE INSP --DON-- ###-####. Grounding kit and 2nd ground rod.
|