Final | 2/25/2000 | 2/28/2000 | 2/28/2000 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 12:45:14. Contact: ###-####. Bathroom GFCI called contr. 2/29/00 3:09:37 PM
|
Final | 2/28/2000 | 2/28/2000 | 2/28/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 10:07:42. Contact: ###-####.
|
Rough-In Permanent Service | 1/12/2000 | 1/12/2000 | 1/12/2000 | A | PASS |
Joe Ray
|
|
|
Ele. R/I; perm./svc.
|