Final | 5/16/2000 | 5/18/2000 | 5/18/2000 | P | PASS |
Marv Burrus
|
|
|
###-#### completed 5/24/00 11:04:12 AM
|
Electrical Rough-In | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PASS |
Marv Burrus
|
|
|
exterior u/g for street lighting butch ###-#### 2" U/G for parking lot (future conduit). 3/23/00 1:36:35 PM
|
Permanent Service | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PASS |
Marv Burrus
|
|
|
###-#### P/S U/G N ok 3/23/00 1:36:17 PM
|
Electrical Rough-In | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | PASS |
Mike Kinnear
|
|
|
early am butch ###-#### Ok cover ufer groung. 3/14/00 10:35:34 AM
|
Electrical Rough-In | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | PART |
Marv Burrus
|
|
|
conference butch ###-#### call before going out conference; equipment grounding/service. 2/22/00 10:04:19 AM
|
Electrical Rough-In | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PART |
Marv Burrus
|
|
|
Butch; ###-####. 1st floor bathrooms r\i 2/1/00 2:59:30 PM
|
Electrical Rough-In | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | PART |
Marv Burrus
|
|
|
###-#### conference discussed unfused conductors 1/28/00 9:43:10 AM
|