Final | 2/11/2000 | 2/14/2000 | 2/14/2000 | A | PASS |
Marv Burrus
|
|
|
###-#### Ok. 2/14/00 2:17:16 PM
|
Electrical Rough-In | 1/27/2000 | 1/28/2000 | 1/28/2000 | A | PASS |
Marv Burrus
|
|
|
Mark ###-####. 1 st floor suite 100 walls r/i 1/28/00 12:43:40 PM
|
Electrical Rough-In | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | NR |
Pat Lass
|
|
|
Marc ###-####. not ready canceled 1/28/00 8:16:34 AM
|
Electrical Rough-In | 1/26/2000 | 1/26/2000 | 1/26/2000 | P | PART |
Marv Burrus
|
|
|
###-#### walln e/e r/s pcs room 1/27/00 2:33:33 PM
|
Electrical Rough-In | 1/13/2000 | 1/14/2000 | 1/14/2000 | A | PART |
Marv Burrus
|
|
|
rough ceiling inspection Mike ###-#### or Mark ###-#### Ceiling Ele. R/I ok 1/14/00 3:11:09 PM
|