Final | 2/29/2000 | 3/1/2000 | 3/1/2000 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 11:31:23. Contact: ###-####. Cor. posted called see JF for details. 3/2/00 9:00:07 AM
|
Final | 3/1/2000 | 3/1/2000 | 3/1/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 09:50:42. Contact: ###-####.
|
Electrical Rough-In | 2/23/2000 | 2/25/2000 | 2/25/2000 | A | PART |
Mike Kinnear
|
|
|
doug keith ###-#### conference Conference with Doug Keith. 2/25/00 3:09:40 PM
|
Electrical Rough-In | 1/19/2000 | 1/19/2000 | 1/19/2000 | A | PASS |
Jim Schmer
|
|
|
upstairs only -- jms.. Up stairs only. 1/19/00 11:27:44 AM
|