Final | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 12:35:55. Contact: ###-####. final ok 2/1/00 2:08:13 PM
|
Final | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 08:28:13. Contact: ###-####. ok for concrete on ground 1/31/00 8:34:43 AM
|
Electrical Rough-In | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | PART |
Pat Lass
|
|
|
billie ###-#### r/i U/G ok. 1/20/00 4:24:43 PM
|