Final | 4/10/2000 | 4/10/2000 | 4/10/2000 | P | PASS |
Pat Lass
|
|
|
###-#### STEVE RE-INSP FN Final ok 4/11/00 1:45:06 PM
|
Final | 4/5/2000 | 4/6/2000 | 4/6/2000 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/05/2000 at 15:12:53. Contact: ###-####. address conflict 4/7/00 12:36:00 PM
|
Electrical Rough-In | 1/25/2000 | 1/27/2000 | 1/27/2000 | P | PASS |
Pat Lass
|
|
|
###-#### r/i p/s ok 1/28/00 8:16:08 AM
|