Final | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/31/2000 at 09:33:15. Contact: ###-####. Final ok. 4/3/00 9:37:22 AM
|
Electrical Rough-In | 1/25/2000 | 1/26/2000 | 1/26/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 17:17:44. Contact: ###-####.
|