Final | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PASS |
Marv Burrus
|
|
|
###-#### reinspection. corrections completed. 10/17/2000 9:28:34 PM
|
Final | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | FAIL |
Marv Burrus
|
|
|
###-####. nec: 680-41(d). all metal within 5ft. of spa shall be bonded. Posted; called contractor. 10/16/2000 9:19:28 PM
|
Final | 5/26/2000 | 5/30/2000 | 5/30/2000 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 05/26/2000 at 13:14:35. Contact: ###-####. Not ready; will reschedule 5/30/00 12:05:24 PM
|
Rough-In Permanent Service | 2/23/2000 | 2/23/2000 | 2/23/2000 | P | PASS |
Marv Burrus
|
|
|
###-#### Ele. R/I. 2/24/00 1:28:46 PM
|
Permanent Service | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | PART |
Marv Burrus
|
|
|
###-#### perm serv. only 1/27/00 2:34:40 PM
|