Final | 3/7/2000 | 3/8/2000 | 3/8/2000 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/07/2000 at 15:43:28. Contact: ###-####. Final ok. 3/8/00 2:08:17 PM
|
Electrical Rough-In | 1/26/2000 | 1/26/2000 | 1/26/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/26/2000 at 08:38:15. Contact: ###-####. R/I ok. 1/27/00 9:15:37 AM
|