Final | 3/29/2000 | 3/30/2000 | 3/30/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/29/2000 at 12:03:03. Contact: ###-####.
|
Electrical Rough-In | 2/1/2000 | 2/2/2000 | 2/2/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/01/2000 at 12:14:19. Contact: ###-####.
|