Final | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/18/2000 at 10:32:31. Contact: ###-####.
|
Electrical Rough-In | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | PART |
Marv Burrus
|
|
|
brandon ###-#### Corrections completed. 2/4/00 10:34:18 AM
|
Electrical Rough-In | 2/2/2000 | 2/2/2000 | 2/2/2000 | P | FAIL |
Joe Ray
|
|
|
300-4 protection of conduit
|