Final | 2/3/2000 | 2/4/2000 | 2/4/2000 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 14:04:04. Contact: ###-####. P/S only the in rest of the building is a mess. 2/7/00 8:54:39 AM
|
Final | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | FAIL |
Jack Frank
|
|
|
###-#### David grd. and bond as code states, needs nuetral bus (manufactures). 2/4/00 11:26:20 AM
|