Final | 4/10/2000 | 4/10/2000 | 4/10/2000 | P | PASS |
Jack Frank
|
|
|
vivan ###-#### fn ok 4/11/00 11:14:00 AM
|
Final | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 04/05/2000 at 12:31:05. Contact: ###-####. Correction posted called no power to bathroom ; cook top exhaust on kit. circuit 4/6/00 2:57:16 PM
|
Electrical Rough-In | 2/10/2000 | 2/11/2000 | 2/11/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 12:03:27. Contact: ###-####. P/S U/G N Final ok. R/I ok to cover. 2/14/00 12:00:58 PM
|