Electrical Rough-In | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by Inspector: 315 On 5/2/2001 2:19:48 PM conference with John of Romar and Steed Const clearence for service gear that was added to original service gear ok 5/2/2001 3:36:53 PM
|
Final | 6/14/2000 | 6/14/2000 | 6/14/2000 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 08:36:11. Contact: ###-####.
|
Final | 5/9/2000 | 5/9/2000 | 5/9/2000 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 10:21:14. Contact: . no address on building no one there no paper work no phine to call 5/10/00 12:19:07 PM
|
Rough-In Permanent Service | 3/29/2000 | 3/29/2000 | 3/29/2000 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/29/2000 at 07:12:19. Contact: ###-####.
|
Electrical Rough-In | 3/24/2000 | 3/24/2000 | 3/24/2000 | P | PASS |
Joe Ray
|
|
|
CONF\\###-####
|
Electrical Rough-In | 3/22/2000 | 3/22/2000 | 3/22/2000 | P | PASS |
Joe Ray
|
|
|
###-####
|
Electrical Rough-In | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PART |
Joe Ray
|
|
|
###-#### Conference 3/20/00 10:42:55 AM
|