Final | 4/5/2000 | 4/5/2000 | 4/5/2000 | P | PASS |
Jack Frank
|
|
|
###-#### Ok 4/6/00 8:49:06 AM
|
Electrical Rough-In | 2/17/2000 | 2/18/2000 | 2/18/2000 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 07:52:47. Contact: ###-####. P/S U/G N final ok cover R/I. 2/22/00 10:06:37 AM
|