Final | 3/30/2000 | 3/31/2000 | 3/31/2000 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/30/2000 at 21:41:50. Contact: ###-####. Completed. 3/31/00 11:46:12 AM
|
Electrical Rough-In | 2/21/2000 | 2/22/2000 | 2/22/2000 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/21/2000 at 13:50:32. Contact: ###-####. 1st floor, walls R/I. 2/23/00 2:02:23 PM
|