Electrical Rough-In | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 08:40:44. Contact: ###-####. Finaled 3-16-00 5/19/00 7:25:08 AM
|
Final | 3/14/2000 | 3/14/2000 | 3/14/2000 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 08:34:11. Contact: ###-####. Final ok. 3/16/00 11:17:13 AM
|
Electrical Rough-In | 2/18/2000 | 2/22/2000 | 2/22/2000 | A | PART |
Pat Lass
|
|
|
Partial R/I ok. 2/23/00 1:57:18 PM
|
Electrical Rough-In | 2/18/2000 | 2/22/2000 | 2/22/2000 | A | PART |
Pat Lass
|
|
|
1st floor east end ###-#### Partial r/I ok. 2/23/00 1:57:24 PM
|