Final | 5/12/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 07:17:02. Contact: ###-####. OK 5/12/00 11:30:28 AM
|
Final | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 07:27:09. Contact: ###-####. CORRECTION POSTED CALLED MESSAGE SAID NO SERVICE NEEDS TO PROTECT CABLE AND INSTALL PROPER SIZE BOX ISLAND COUNTER 5/4/00 3:17:15 PM
|
Rough-In Permanent Service | 3/7/2000 | 3/8/2000 | 3/8/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/07/2000 at 11:23:24. Contact: ###-####. P/S U/G R/I ok. 3/8/00 2:08:40 PM
|