Final | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PASS |
Marv Burrus
|
|
|
###-#### completed 5/5/00 1:51:57 PM
|
Permanent Service | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PART |
Marv Burrus
|
|
|
###-#### Perm/svc.; bond to gas pipe not installed @ this time 3/22/00 1:02:53 PM
|
Rough-In Permanent Service | 3/14/2000 | 3/14/2000 | 3/14/2000 | P | PART |
Joe Ray
|
|
|
mitch ###-#### R/I ok- P/S needs gas pipe bond and concrete encased electrode. 3/16/00 11:15:37 AM
|