Final | 6/21/2000 | 6/22/2000 | 6/22/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 16:09:35. Contact: ###-####. Ok corrections made no access to install stickers at panel 6/22/00 2:17:28 PM
|
Final | 6/20/2000 | 6/20/2000 | 6/20/2000 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/20/2000 at 09:07:01. Contact: ###-####. Correction posted called see 315 for details. 6/21/00 11:46:32 AM
|
Electrical Rough-In | 3/20/2000 | 3/21/2000 | 3/21/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/20/2000 at 15:53:02. Contact: ###-####. OK U/G N 3/21/00 12:06:08 PM
|
Rough-In Permanent Service | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | FAIL |
Jack Frank
|
|
|
###-#### Cor. posted called box fill 210-52 A, B 3/20/00 4:46:56 PM
|