Final | 4/3/2000 | 4/4/2000 | 4/4/2000 | P | PASS |
Mike Kinnear
|
|
|
###-#### Final ok 4/5/00 8:32:39 AM
|
Electrical Rough-In | 3/23/2000 | 3/24/2000 | 3/24/2000 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/23/2000 at 11:51:58. Contact: ###-####. Corrections not made 3/24/00 1:14:13 PM
|
Electrical Rough-In | 3/24/2000 | 3/24/2000 | 3/24/2000 | P | PASS |
Pat Lass
|
|
|
late pm ###-#### R/I ok 3/27/00 10:14:19 AM
|
Electrical Rough-In | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | FAIL |
Pat Lass
|
|
|
Rowdy ###-#### Supports and protection 3/23/00 4:42:41 PM
|