Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Marv Burrus
|
|
|
###-#### jerry. generator field-evaluation test performed, certificate/results faxed to building department. verification of tag on equiptment was performed. ok. 3/16/2001 10:33:22 AM
|
Final | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | FAIL |
Marv Burrus
|
|
|
FN FOR GENERATOR- JERRY ###-####. requested fax of copy for field evaluation of test for emergency generator listing. 1/4/2001 4:50:30 PM
|
Final | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | PASS |
Marv Burrus
|
|
|
Challenger Electric ###-####. emergency generator/transfer switch. 8/7/2000 6:07:44 PM
|
Electrical Rough-In | 3/30/2000 | 3/31/2000 | 3/31/2000 | A | PART |
Marv Burrus
|
|
|
###-#### Conference; PVC installation in trench. 3/31/00 11:45:58 AM
|