Final | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 10:08:12. Contact: ###-####. Ok 8/7/00 8:35:49 AM
|
Final | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | FAIL |
Jack Frank
|
|
|
at 10 am partial final ###-#### Jack
|
Electrical Rough-In | 6/28/2000 | 6/29/2000 | 6/29/2000 | A | NR |
Jack Frank
|
|
|
will take 2-3 hours to do inspection-jack ###-#### jack of Al's electric did not show up wasted 40 minutes waiting for him $42.00 reinspection fee due 6/30/00 8:05:31 AM
|
Electrical Rough-In | 5/3/2000 | 5/10/2000 | 5/10/2000 | P | PASS |
Mike Kinnear
|
|
|
1:30 MEETING WITH AL'S ELECT. CALL ###-####, OR ###-#### 5/9/00 11:49:05 AM Part R/I & conference. 5/11/00 11:33:51 AM
|
Electrical Rough-In | 5/2/2000 | 5/3/2000 | 5/3/2000 | P | CANC |
Jack Frank
|
|
|
Jack ###-#### 1:00 al's electric schelduled this with pat lass not me he will reschedule with me 5/3/00 4:04:11 PM
|